top of page
Rivermead Leisure Complex
Installation of the swimming pool and changing village.
Intergas carried out all wet mechanical installation to the new build demountable swimming pool and changing village.
Starting with the installation of an additional 6--kW Broag boiler to the existing plant room.
The supplied heat and hot water routed from the existing plant room across to the new build in pre-insulated feeding both the changing village shower blocks and the new plant room with pool and AHU heating.
Project Gallery
bottom of page