de vere Wokefield Estate

Full decommission and strip out of the existing steel heating system, Steel hot water pipe work and steel boosted cold water pipe work. 

Installing and zoning all new two pipe system back and through to the plant room, carrying out the required alterations to the existing plant room. 

We then carried out a full re-pipe of the BWCS, HWS HWR, SVP and waste pipe work supplying en-suites. 

 